Skip to content

Density Test Report

Date :09/18/2024
Project No :2024C168
Client Company :CCG
Arrival Time :09/18/2024 10:45
Onsite Hours :08:00
Name of the Project :Reserve @ Gum Springs
Project Location :Jefferson
Weather :cloudy
Departure Time :09/18/2024 18:45
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
09/18/2024 100 20.5 97.9 26081 102.9 20.0 95.1 95 D2937 Pass
Location : Sewer trench, 48 feet SE from MHSK1, Elv/Depth :2.5 feet below finished grade
Comment :
09/18/2024 101 25.9 89.5 26082 94.1 24.3 95.1 95 D2937 Pass
Location : Sewer trench, 59 feet SE from MHSK1, Elv/Depth :finished grade
Comment :
09/18/2024 102 22.3 98.0 26081 102.9 20.0 95.2 95 D2937 Pass
Location : Storm water trench, between MHA12.3 and MH12.3.1., Elv/Depth :finished grade
Comment :
09/18/2024 103 21.1 98.5 26081 102.9 20.0 95.7 95 D2937 Pass
Location : Storm water trench, between MHA12.3 and MHA12.4., Elv/Depth :1 foot below finished grade
Comment :
Technician Signature / DateAminullah Azimi, September 18, 2024
Reviewer Name / DateKenneth Mosman, October 20, 2024