Density Test Report

Date :09/23/2024
Project No :2024C168
Client Company :CCG
Arrival Time :09/23/2024 8:00
Onsite Hours :10:30
Name of the Project :Reserve @ Gum Springs
Project Location :Jefferson
Weather :cloudy
Departure Time :09/23/2024 18:30
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
09/23/2024 118 22.3 86.3 26082 94.1 24.3 91.7 95 D2937 Fail
Location : Storm water trench, 9 feet NW from MHA2.5, Elv/Depth :3.5 feet below finished grade
Comment :
09/23/2024 119 26.7 89.7 26082 94.1 24.3 95.3 95 D2937 Pass
Location : Storm water trench, 10 feet SE from MHA2, Elv/Depth :4 feet below finished grade
Comment :
09/23/2024 120 26.5 91.1 26082 94.1 24.3 96.8 95 D2937 Pass
Location : Serwer trench, 10 feet SE from MHSK1, Elv/Depth :4 feet below finished grade
Comment :
09/23/2024 121 21.1 97.9 26081 102.9 20.0 95.1 95 D2937 Pass
Location : Sewer trench, 10 feet NW from MHSSK1, Elv/Depth :4 feet below finished grade
Comment :
09/23/2024 122 26.3 91.3 26082 94.1 24.3 97.0 95 D2937 Pass
Location : Service line for Lot #188, Elv/Depth :2.5 feet below finished grade
Comment :
09/23/2024 123 20.3 98.3 26081 102.9 20.0 95.5 95 D2937 Pass
Location : Sewer trench, 10 feet NE from MHSK2, Elv/Depth :4 feet below finished grade
Comment :
09/23/2024 124 21.6 98.5 26081 102.9 20.0 95.7 95 D2937 Pass
Location : Service line for Lot #1, Elv/Depth :4 feet below finished grade
Comment :
09/23/2024 125 23.6 89.9 26082 94.1 24.3 95.5 95 D2937 Pass
Location : Sewer trench, 9 feet SE from MHSK2, Elv/Depth :3 feet below finished grade
Comment :
09/23/2024 126 22.2 100.5 26081 102.9 20.0 97.7 95 D2937 Pass
Location : Storm water trench, 10 feet NW from MHB13., Elv/Depth :1 foot below finished grade
Comment :
09/23/2024 127 25.0 90.9 26082 94.1 24.3 96.6 95 D2937 Pass
Location : Storm trench, 12 feet SE from MHB14, Elv/Depth :4 feet below finished grade
Comment :
Technician Signature / DateAminullah Azimi, September 23, 2024
Reviewer Name / DateKenneth Mosman, October 20, 2024