- Home
- Density Test Report Report ID: 70943
- This project is inactive from admin. Download Report
Density Test Report
Date :10/02/2024
Project No :2024C168
Client Company :CCG
Arrival Time :10/02/2024 8:00
Onsite Hours :07:00
Name of the Project :Reserve @ Gum Springs
Project Location :Jefferson
Weather :sunny
Departure Time :10/02/2024 15:00
ASEC Technician Name :Aminullah Azimi
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 10/02/2024 | 140 | 27.1 | 98.2 | 26081 | 102.9 | 20.0 | 95.4 | 95 | D2937 | Pass |
| Location : | Sewer trench, 10 feet NW from MHSH1, Elv/Depth :1 foot below finished grade | |||||||||
| Comment : | ||||||||||
| 10/02/2024 | 141 | 24.7 | 100.2 | 26081 | 102.9 | 20.0 | 97.4 | 95 | D2937 | Pass |
| Location : | Sewer trench, 9 feet SE from MHSH2, Elv/Depth :1 foot below finished grade | |||||||||
| Comment : | ||||||||||
| 10/02/2024 | 142 | 23.0 | 99.5 | 26081 | 102.9 | 20.0 | 96.7 | 95 | D2937 | Pass |
| Location : | Sewer trench, 11 feet NW from MHSH2, Elv/Depth :1 foot below finished grade | |||||||||
| Comment : | ||||||||||
Technician Signature / DateAminullah Azimi, October 2, 2024
Reviewer Name / DateKenneth Mosman, October 20, 2024
