Skip to content

Density Test Report

Date :10/12/2024
Project No :2024C168
Client Company :CCG
Arrival Time :10/12/2024 8:00
Onsite Hours :07:30
Name of the Project :Reserve @ Gum Springs
Project Location :Jefferson
Weather :sunny
Departure Time :10/12/2024 15:30
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
10/12/2024 174 21.9 100.1 26081 102.9 20.0 97.3 95 D2937 Pass
Location : Sewer trench, 18 feet NW from MHSE2, Elv/Depth :1 foot below finished grade
Comment :
10/12/2024 175 22.1 99.5 26081 102.9 20.0 96.7 95 D2937 Pass
Location : Sewer trench, 157 feet NW from MHSE2, Elv/Depth :1 foot below finished grade
Comment :
10/12/2024 176 26.5 89.7 26082 94.1 24.3 95.3 95 D2937 Pass
Location : Sewer trench, 15 feet SE from MHSF3, Elv/Depth :1 foot below finished grade
Comment :
Technician Signature / DateAminullah Azimi, October 12, 2024
Reviewer Name / DateKenneth Mosman, October 20, 2024