- Home
- Density Test Report Report ID: 72572
- This project is inactive from admin. Download Report
Density Test Report
Date :10/29/2024
Project No :2024C168
Client Company :CCG
Arrival Time :10/29/2024 8:00
Onsite Hours :06:30
Name of the Project :Reserve @ Gum Springs
Project Location :Jefferson
Weather :sunny
Departure Time :10/29/2024 14:30
ASEC Technician Name :Aminullah Azimi
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 10/29/2024 | 248 | 20.3 | 101.5 | 26081 | 102.9 | 20.0 | 98.6 | 98 | D6938 | Pass |
| Location : | Roadway between Lot #192 and Lot #164, Elv/Depth :finished grade | |||||||||
| Comment : | Gauge Serial No. :85759 | |||||||||
| 10/29/2024 | 249 | 21.7 | 122.8 | 26081 | 102.9 | 20.0 | 98.1 | 98 | D6938 | Pass |
| Location : | Roadway between Lot #193 and Lot #213, Elv/Depth :finished grade | |||||||||
| Comment : | Gauge Serial No. :85759 | |||||||||
| 10/29/2024 | 250 | 20 | 101.1 | 26081 | 102.9 | 20.0 | 98.3 | 98 | D6938 | Pass |
| Location : | Roadway between Lot #211 and Lot #197, Elv/Depth :finished grade | |||||||||
| Comment : | Gauge Serial No. :85759 | |||||||||
| 10/29/2024 | 251 | 20.3 | 101.3 | 26081 | 102.9 | 20.0 | 98.4 | 98 | D6938 | Pass |
| Location : | Roadway between Lot #216 and Lot #209, Elv/Depth :finished grade | |||||||||
| Comment : | Gauge Serial No. :85759 | |||||||||
| 10/29/2024 | 252 | 19.8 | 121.1 | 26081 | 102.9 | 20.0 | 98.3 | 98 | D6938 | Pass |
| Location : | Roadway between Lot #223 and Lot #206, Elv/Depth :finished grade | |||||||||
| Comment : | Gauge Serial No. :85759 | |||||||||
| 10/29/2024 | 253 | 20.2 | 101.1 | 26081 | 102.9 | 20.0 | 98.3 | 98 | D6938 | Pass |
| Location : | Roadway in the front of Lot #226, Elv/Depth :finished grade | |||||||||
| Comment : | Gauge Serial No. :85759 | |||||||||
| 10/29/2024 | 254 | 19.5 | 101.2 | 26081 | 102.9 | 20.0 | 98.3 | 98 | D6938 | Pass |
| Location : | Roadway in the front of Lot #224, Elv/Depth :finished grade | |||||||||
| Comment : | Gauge Serial No. :85759 | |||||||||
| 10/29/2024 | 255 | 21.2 | 100.9 | 26081 | 102.9 | 20.0 | 98.1 | 98 | D6938 | Pass |
| Location : | Roadway between Lot #222 and Lot #155, Elv/Depth :finished grade | |||||||||
| Comment : | Gauge Serial No. :85759 | |||||||||
| 10/29/2024 | 256 | 21.5 | 101.3 | 26081 | 102.9 | 20.0 | 98.4 | 98 | D6938 | Pass |
| Location : | Roadway between Lot #217 and Lot #158, Elv/Depth :finished grade | |||||||||
| Comment : | Gauge Serial No. :85759 | |||||||||
Technician Signature / DateAminullah Azimi, October 29, 2024
Reviewer Name / DateKenneth Mosman, November 05, 2024
