Skip to content

Density Test Report

Date :11/06/2024
Project No :2024C168
Client Company :CCG
Arrival Time :11/06/2024 8:00
Onsite Hours :10:00
Name of the Project :Reserve @ Gum Springs
Project Location :Jefferson
Weather :cloudy
Departure Time :11/06/2024 18:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
11/06/2024 280 26 92.4 26082 94.1 24.3 98.2 98 D6938 Pass
Location : roadway between Lots #129 and #228, Elv/Depth :finished grade
Comment : Gauge Serial No. :85759
11/06/2024 281 20.1 101.5 26081 102.9 20.0 98.6 98 D6938 Pass
Location : roadway between Lots #149 and #243, Elv/Depth :finished grade
Comment : Gauge Serial No. :85759
11/06/2024 282 22 93.0 26082 94.1 24.3 98.8 98 D6938 Pass
Location : roadway between Lots #149 and #243, Elv/Depth :finished grade
Comment : Gauge Serial No. :
11/06/2024 283 22.3 114.1 26082 94.1 24.3 99.1 98 D6938 Pass
Location : roadway between Lots #144 and #239, Elv/Depth :finished grade
Comment : Gauge Serial No. :85759
11/06/2024 284 25.3 90.7 26082 94.1 24.3 96.4 95 D2937 Pass
Location : water line in front of Lot #104, Elv/Depth :finished grade
Comment :
11/06/2024 285 24.5 91.2 26082 94.1 24.3 96.9 95 D2937 Pass
Location : water line in front of Lot #107, Elv/Depth :finished grade
Comment :
11/06/2024 286 20.7 100.2 26081 102.9 20.0 97.4 98 D2937 Fail
Location : water line in front of Lot #109, Elv/Depth :finished grade
Comment :
Technician Signature / DateAminullah Azimi, November 6, 2024
Reviewer Name / DateKenneth Mosman, January 11, 2025