- Home
- Density Test Report Report ID: 73294
- Edit Download Report
Density Test Report
Date :11/18/2024
Project No :2024C202
Client Company :CCG
Arrival Time :11/18/2024 07:30
Onsite Hours :
Name of the Project :Old Griffin Rd - Hawthorne Reserve
Project Location :Dallas
Weather :Sunny
Departure Time :
ASEC Technician Name :Solomon Cherie
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 11/18/2024 | 101 | 30.6 | 91.1 | S-02 | 97.2 | 24.9 | 93.7 | 95 | D6938 | Fail |
| Location : | Lot#74, Elv/Depth :-1.5 | |||||||||
| Comment : | The second test still shows that the dirt is still wet, and the compaction failed, that is below 95%. I told to the super to scarify for an hour roll it and do backfill. The super accepted the suggestion. | Gauge Serial No. :30942 | ||||||||
Technician Signature / DateSolomon Cherie, November 18, 2024
Reviewer Name / DateKenneth Mosman, January 09, 2025
