Daily Field Report
Observations/Finding
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.
Location: Northfields Lot #4 (off Pittman Road)
Requested By: Larry Gunter (Site Superintendent)
Inspection Details:
A footing inspection was performed as requested. A Dynamic Cone Penetrometer (DCP) test had been previously completed, and the results indicated acceptable soil conditions.
During the inspection, the footing was observed to include two rows of #4 rebar with 2 inches of concrete cover on all sides, in compliance with design requirements. No organic material was present in the footing.
Mr. Gunter was notified, and the footing was deemed acceptable for concrete placement. Concrete was placed the same day.