Skip to content

Density Test Report

Date :11/22/2024
Project No :2024C202
Client Company :CCG
Arrival Time :11/22/2024 07:15
Onsite Hours :
Name of the Project :Old Griffin Rd - Hawthorne Reserve
Project Location :Dallas
Weather :Partly cloudy
Departure Time :
ASEC Technician Name :Solomon Cherie

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
11/22/2024 109 25.9 0.0 S-02 97.2 24.9 0.0 D6938 Pass
Location : Downcut location, Elv/Depth :
Comment : The purpose of this test is to check moisture content of the dirt at the down cut or dirt quarry. So, the moisture is good when compared to the proctor as shown above. Gauge Serial No. :30942
Technician Signature / DateSolomon Cherie, November 22, 2024
Reviewer Name / DateKenneth Mosman, January 09, 2025