- Daily Field Report Report ID: 73569
- Edit Download Report
Daily Field Report
Observations/Finding
Our AS Engineering & Consulting (ASEC) representative arrived on site to observe field activities. The following tasks were performed:
Observed the placement of fill/grading for Lot #112 and adjacent roadways today. Compaction tests were performed using a nuclear density gauge. Overall, the results of density testing confirmed that fill compaction met the project and ASTM requirements. Results are attached in separate reports.
A section on the backside of Lot #112 displayed deflection and pumping under dump truck traffic after compaction testing. The contractor was made aware of this but chose to continue placing fill.
Please contact us if you have any questions regarding this report or of the density test results.

Picture showing Lot# 112. and access road about 5.00' to subgrade