Daily Field Report
Date :11/25/2024
Project No :2024C217
Client Company :Artisan
Arrival Time :11/25/2024 07:30
Onsite Hours :9:30
Name of the Project :Naturewalk - 7 Hills Amenities
Project Location :Dallas
Weather :sunny
Departure Time :11/25/2024 17:00
ASEC Technician Name :Vamsi Polisetty
Observations/Finding
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.
Seven Hills: Amenities
- Upon arrival, the contractor was engaged in grading the roadway using a Komatsu PC 360LC and west of the job site. Fill was being transported with two tandem- axled dump trucks for the tennis court and parking area, while dozing was performed with a Komatsu 39px and compaction with CAT563E.
- The next lift of fill was started on the tennis court & parking area.
- Proof-rolling of the boulder fill was utilized to verify stability in lieu of density testing using a nuclear density gauge.
- Compaction testing was performed using a Troxler nuclear density gauge, along with general probing using a 3/8″ diameter probe rod.
Nature walk: Lot Inspection (Lot #1ooo, #1001, #1002, #1003, #1004, #1005 and #1006).





Technician Signature / DateVamsi Polisetty, November 25, 2024
Reviewer Name / DateKenneth Mosman, January 17, 2025