Skip to content

Density Test Report

Date :12/07/2024
Project No :2024C168
Client Company :CCG
Arrival Time :12/07/2024 8:15
Onsite Hours :07:15
Name of the Project :Reserve @ Gum Springs
Project Location :Jefferson
Weather :cloudy
Departure Time :12/07/2024 15:30
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
12/07/2024 361 21.9 99.8 26081 102.9 20.0 97.0 95 D2937 Pass
Location : water line in front of Lot #197, Elv/Depth :0.5 foot below finished grade
Comment :
12/07/2024 362 24.5 98.3 26081 102.9 20.0 95.5 95 D2937 Pass
Location : water line in front of Lot #196, Elv/Depth :0.5 feet below finished grade
Comment :
12/07/2024 363 21.3 100.3 26081 102.9 20.0 97.5 95 D2937 Pass
Location : water line in front of Lot #194, Elv/Depth :0.5 foot below finished grade
Comment :
12/07/2024 364 18.8 97.6 26086 99.8 19.7 97.8 95 D6938 Pass
Location : retaining wall at Station 60+00, Elv/Depth :7 feet below finished grade
Comment : Gauge Serial No. :8579
12/07/2024 366 16.5 97.4 26086 99.8 19.7 97.6 95 D6938 Pass
Location : retaining wall #2 backfill at Station 100+00, Elv/Depth :6 feet below finished grade
Comment : Gauge Serial No. :85759
12/07/2024 366 18.3 98.6 26086 99.8 19.7 98.8 95 D6938 Pass
Location : retaining wall #2 backfill at Station 20+00, Elv/Depth :10 feet below finished grade
Comment : Gauge Serial No. :85759
12/07/2024 367 22.4 98.6 26081 102.9 20.0 95.8 95 D2937 Pass
Location : water line in front of Lot #220, Elv/Depth :1 foot below finished grade
Comment :
12/07/2024 368 21.2 99.1 26081 102.9 20.0 96.3 95 D2937 Pass
Location : water line in front of Lot #215, Elv/Depth :1 foot below finished grade
Comment :
Technician Signature / DateAminullah Azimi, December 7, 2024
Reviewer Name / DateKenneth Mosman, January 11, 2025