Date :12/05/2024
Project No :2024C217
Client Company :Artisan
Arrival Time :12/05/2024 08:00
Onsite Hours :9:00
Name of the Project :Naturewalk - 7 Hills Amenities
Project Location :Dallas
Weather :cloudy
Departure Time :12/05/2024 17:00
ASEC Technician Name :Vamsi Polisetty
Observations/Finding
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.
Seven Hills: Amenities
- Upon arrival, the contractor was engaged grade work for the roadway using a Komatsu PC 360LC and from the west of the job site. Fill was being transported with two tandem-axled dump trucks for the tennis court and parking area, while dozing was performed with a Komatsu 39px and compaction with CAT563E.
- Compaction testing was performed using a Troxler nuclear density gauge, along with general probing using a 3/8″ diameter probe rod on the Club house area.
- Proof-rolling of the boulder fill was utilized to verify stability in lieu of density testing using a nuclear density gauge.
- Density test results indicate that compacted materials did meet the project requirement of 95% of the maximum dry density obtained by a Standard Proctor ASTM 698.
Nature walk: Lot Inspection (Lot #1ooo, #1001, #1002, #1003, #1004, #1005, #1006).



















Technician Signature / DateVamsi Polisetty, December 5, 2024