Daily Field Report

Date :12/06/2024
Project No :2024C217
Client Company :Artisan
Arrival Time :12/06/2024 08:00
Onsite Hours :08:00
Name of the Project :Naturewalk - 7 Hills Amenities
Project Location :Dallas
Weather :cloudy
Departure Time :12/06/2024 16:00
ASEC Technician Name :Vamsi Polisetty

Observations/Finding

As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services.  Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.

Seven Hills: Amenities

  • The contractor has begun preparation for the upcoming rainy days by removing soils from the slopes and roadway. This is being done using a Komatsu PC 360LC excavator and a Komatsu 39PX dozer.

Naturewalk: Lot Inspection (Lot #1ooo, #1001, #1002, #1003, #1004, #1005 and #1006).

  • The contractor utilized a Komatsu D85EX bulldozer to perform grading for the above referenced lots.
  • In addition, a Komatsu PC210 LC excavator was employed for the breaking up of on-site boulders. Equipped with a hydraulic hammer, the excavator was used to break large rocks and boulders encountered on the site.

We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.

Technician Signature / DateVamsi Polisetty, December 6, 2024
Reviewer Name / DateKenneth Mosman, January 17, 2025