Date :12/23/2024
Project No :2024C217
Client Company :Artisan
Arrival Time :12/23/2024 08:00
Onsite Hours :08:00
Name of the Project :Naturewalk - 7 Hills Amenities
Project Location :Dallas
Weather :sunny
Departure Time :12/23/2024 16:00
ASEC Technician Name :Vamsi Polisetty

Observations/Finding

As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services.  Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.

Seven Hills: Amenities:

The contractor began clearing the slopes and continuing the drying process using a Komatsu PC360LC excavator and a Komatsu 39PX dozer. With the Komatsu Pc360LC, the wet soil at the end of the road was cut and transported and spread out for drying.

Nature Walk: Lot #995

Lot 995 grading was continued using a Komatsu 39PXI dozer and a Komatsu PC240LC excavator. The slopes at the rear of the lot were corrected by adding fill.  No backfilling was done except for the slopes. Additionally, test pits have been excavated at four locations to assess the underlying soil conditions. The results indicate that the soil is residual, with a partially weathered rock layer located beneath the residual soils.

We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.

Technician Signature / DateVamsi Polisetty, December 23, 2024
Reviewer Name / DateKenneth Mosman, January 17, 2025