Skip to content

Density Test Report

Date :01/03/2025
Project No :2024C168
Client Company :CCG
Arrival Time :01/03/2025 8:45
Onsite Hours :08:45
Name of the Project :Reserve @ Gum Springs
Project Location :Jefferson
Weather :sunny
Departure Time :01/03/2025 17:30
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
01/03/2025 417 24.7 98.7 26081 102.9 20.0 95.9 95 D2937 Pass
Location : SSFM in front of Lot #232, Elv/Depth :1 foot below finished grade
Comment :
01/03/2025 418 22.5 100.2 26081 102.9 20.0 97.4 95 D2937 Pass
Location : SSFM in front of Lot #234, Elv/Depth :1 foot below finished grade
Comment :
01/03/2025 419 26.8 92.3 26082 94.1 24.3 98.1 95 D2937 Pass
Location : SSFM in front of Lot #233, Elv/Depth :finished grade
Comment :
01/03/2025 420 27.4 91.6 26082 94.1 24.3 97.3 95 D2937 Pass
Location : SSFM in front of Lot #136, Elv/Depth :1.5 feet below finished grade
Comment :
Technician Signature / DateAminullah Azimi, January 3, 2025
Reviewer Name / DateKenneth Mosman, January 14, 2025