Density Test Report

Date :01/21/2025
Project No :2024C168
Client Company :Century Communities
Arrival Time :01/21/2025 8:00
Onsite Hours :08:30
Name of the Project :Reserve @ Gum Springs
Project Location :Jefferson, Jackson County, Georgia
Weather :sunny
Departure Time :01/21/2025 16:30
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
01/21/2025 443 2.4 137.0 27651 143.6 5.4 93.2 92 D6938 Pass
Location : Retaining wall #1 backfill at station 1+10, Elv/Depth :7 feet below finished grade
Comment : Gauge Serial No. :85759
01/21/2025 444 2.4 133.1 27651 143.6 5.4 92.7 92 D6938 Pass
Location : Retaining wall#1 backfill at station 0+6, Elv/Depth :6 feet below finished grade
Comment : Gauge Serial No. :85759
01/21/2025 445 2.5 134.7 27651 143.6 5.4 93.8 92 D6938 Pass
Location : Retaining wall #1 backfill at station 0+10, Elv/Depth :5.5 feet below finished grade
Comment : Gauge Serial No. :85759
01/21/2025 446 2.5 132.9 27651 143.6 5.4 92.5 92 D6938 Pass
Location : Retaining wall #1 backfill at station 1+12, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :85759
01/21/2025 447 2.3 137.5 27651 143.6 5.4 95.8 95 D6938 Pass
Location : Retaining wall #1 backfill at station 0+65, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :85759
01/21/2025 448 3.1 134.1 27651 143.6 5.4 93.4 92 D6938 Pass
Location : Retaining wall #1 backfill at station 0+09, Elv/Depth :3.5 feet below finished grade
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, January 21, 2025