- Daily Field Report Report ID: 76791
- This project is inactive from admin. Download Report
Daily Field Report
Date :01/28/2025
Project No :2024C168
Client Company :Century Communities
Arrival Time :01/28/2025 8:00
Onsite Hours :9:00
Name of the Project :Reserve @ Gum Springs
Project Location :Jefferson, Jackson County, Georgia
Weather :sunny
Departure Time :01/28/2025 17:00
ASEC Technician Name :Aminullah Azimi
Observations/Finding
As requested, our AS Engineering and Consulting (ASEC) representative visited the site to provide quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawings/specifications, applicable codes, and material submittals.
Site Observations:
- “The existing curb was demolished to make way for a decel lane at the entrance. The curb was located close to the road, and the base was prepared for the installation of a new curb
- The installation, placement and compaction of GAB for retaining wall #1 and retaining wall#2 were in progress.
- The placement of ride-rock blocks was in progress.
- A 1-foot layer of No. 57 stone was utilized behind the blocks and within the wall cells.
- At the time of arrival, for the retaining wall, work was being conducted with 9-inch lifts placed and compacted using a 9-ton smooth drum and trench compaction equipment.
Testing Performed:
- Compaction Testing:
- Testing was conducted using a Troxler nuclear density gauge in accordance with ASTM D 2937 (Standard Test Method for Soil Density).
- General probing was performed with a 3/8″ diameter probe rod.
- Results:
- GAB Density test results indicate that most of the compacted materials met the project requirement of 92% of the maximum dry density as determined by Modified Proctor ASTM D 1557-12.
Conclusion:
The work observed and tested on-site today met the project’s specified requirements for compaction.
Contact Information:
We appreciate the opportunity to assist you with this project. Should you have any questions regarding this report, please do not hesitate to contact us.













Technician Signature / DateAminullah Azimi, January 28, 2025
Reviewer Name / DateKenneth Mosman, February 01, 2025