- Daily Field Report Report ID: 78298
- This project is inactive from admin. Download Report
Daily Field Report
Date :02/26/2025
Project No :2024C168
Client Company :Century Communities
Arrival Time :02/26/2025 8:30
Onsite Hours :9:30
Name of the Project :Reserve @ Gum Springs
Project Location :Jefferson, Jackson County, Georgia
Weather :sunny
Departure Time :02/26/2025 18:00
ASEC Technician Name :Aminullah Azimi
Observations/Finding
Our AS Engineering & Consulting (ASEC) representative arrived on site to observe field activities. The following tasks were performed:
Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.
- The placement and compaction of backfill soils for the SSFM and water lines in creek crossing (location is shown in picture) continued this day.
- At the time of arrival, our representative observed that work was in progress with 1-foot lifts being placed and compacted using 14-ton sheeps-foot and 6-ton pad feet and trench compaction equipment. Compaction testing was performed using the Standard Test Method for Density of Soil in Place by Drive-Cylinder (ASTM D 2937), along with general probing using a 3/8″ diameter probe rod.
- Density test results indicate that most of the compacted materials met the project requirement of 95% of the maximum dry density obtained by a Standard Proctor ASTM 698.
We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.












Technician Signature / DateAminullah Azimi, February 26, 2025
Reviewer Name / DateKenneth Mosman, March 09, 2025