- Home
- Daily Field Report Report ID: 78682
- This project is inactive from admin. Download Report
Daily Field Report
Observations/Finding
Site Visit Report – Cottages at Villa Rica
An AS Engineering and Consulting (ASEC) representative visited the Cottages at Villa Rica site to monitor drilling and rock removal operations. The contractor performing the work was Precision Blasting. The following observations were made on-site:
Blasting Data:
Blasting operations took place today in the northeast corner of the development between Lot #53 and Lot #54 using a mass rock pattern. The total blasted area was 1,944 square feet, with a calculated rock volume of 477.36 cubic yards. The average hole depth was 6.63 feet.
These efforts are part of Precision Blasting’s ongoing work to break up the small trench rock section in the northwest corner of the Cottages at Villa Rica.
We appreciate the opportunity to assist with this project. Should you have any questions regarding this report, please do not hesitate to contact us. We would be happy to discuss any details further.

Lot #53/54