Density Test Report

Date :02/25/2025
Project No :2024C237
Client Company :SR Homes
Arrival Time :02/25/2025 11:30
Onsite Hours :06:30
Name of the Project :Stonewood PH 4, Stone Road
Project Location :Watkinsville
Weather :sunny
Departure Time :02/25/2025 18:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
02/25/2025 1 22.2 99.9 S-02 104.0 19.1 96.1 95 D6938 Pass
Location : outlet control structure at detention pond , Elv/Depth :3 feet below finished grade
Comment : Gauge Serial No. :85759
02/25/2025 2 22.1 100.8 S-02 104.0 19.1 96.9 95 D6938 Pass
Location : outlet control structure at detention pond , Elv/Depth :1.5 feet below finished grade
Comment : Gauge Serial No. :85759
02/25/2025 3 22.5 99.0 S-02 104.0 19.1 95.2 95 D6938 Pass
Location : outlet control structure at detention pond , Elv/Depth :at finished grade
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, February 25, 2025
Reviewer Name / DateKenneth Mosman, April 29, 2025