- Density Test Report Report ID: 79114
- This project is inactive from admin. Download Report
Density Test Report
Date :03/25/2025
Project No :2024C213
Client Company :WDG
Arrival Time :03/25/2025 14:00
Onsite Hours :02:30
Name of the Project :Covington Town Center PH II
Project Location :Covington, GA
Weather :
Departure Time :03/25/2025 16:30
ASEC Technician Name :Clyde Smith
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 03/25/2025 | 1 | 16.8 | 105.1 | ASECP001 | 106.0 | 18.2 | 99.2 | 98 | D6938 | Pass |
| Location : | NE building. corner, Elv/Depth :822.00 | |||||||||
| Comment : | Gauge Serial No. :29855 | |||||||||
| 03/25/2025 | 2 | 17.0 | 106.1 | ASECP001 | 106.0 | 18.2 | 100.1 | 98 | D6938 | Pass |
| Location : | SE corner of building, Elv/Depth :822.00 | |||||||||
| Comment : | Gauge Serial No. :29588 | |||||||||
| 03/25/2025 | 3 | 16.5 | 104.3 | ASECP001 | 106.0 | 18.2 | 98.4 | 98 | D6938 | Pass |
| Location : | SW corner of building, Elv/Depth :822.0 | |||||||||
| Comment : | Gauge Serial No. :29588 | |||||||||
| 03/25/2025 | 4 | 17.4 | 104.3 | ASECP001 | 106.0 | 18.2 | 98.4 | 98 | D6938 | Pass |
| Location : | NW corner of building, Elv/Depth :822.0 | |||||||||
| Comment : | Gauge Serial No. :29588 | |||||||||
Technician Signature / DateClyde Smith, March 25, 2025