Daily Field Report

Date :04/01/2025
Project No :2024C213
Client Company :WDG
Arrival Time :04/01/2025 01:00
Onsite Hours :04:00
Name of the Project :Covington Town Center PH II
Project Location :Covington, GA
Weather :Sunny
Departure Time :04/01/2025 05:00
ASEC Technician Name :Sean Willett

Observations/Finding

As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services.  Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.

On this date, our ASEC representative was on site as requested by the contractor (Buck Vinson).  The technician observed the blasting of residual hard rock for the installation of 18 inches of the HDPE storm line between the structures A-0 and A-1. The contractor began the excavation of loose blast materials from the trench. At this time, no testing was conducted, and all procedures appeared to be performed to job specifications.

We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.

Technician Signature / DateSean Willett, April 1, 2025
Reviewer Name / DateKenneth Mosman, May 01, 2025