Skip to content

Density Test Report

Date :03/14/2025
Project No :2025C146
Client Company :Davidson Homes, LLC
Arrival Time :03/14/2025 9:00
Onsite Hours :9:00
Name of the Project :Greene Farms Subdivision
Project Location :1451 Highway 113, Cartersville, Georgia
Weather :sunny
Departure Time :03/14/2025 18:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
03/14/2025 1 20.1 107.3 ASECP003 109.2 18.5 98.3 95 D6938 Pass
Location : perimeter of pond 2 (location shown in daily report), Elv/Depth :3 feet below finished grade
Comment : Gauge Serial No. :85759
03/14/2025 2 19 104.2 ASECP003 109.2 18.5 95.4 95 D6938 Pass
Location : perimeter of pond 2 (location shown in daily report), Elv/Depth :3 feet below finished grade
Comment : Gauge Serial No. :85759
03/14/2025 3 18 110.6 ASECP004 115.0 12.0 96.2 95 D6938 Pass
Location : perimeter of pond 2 (location shown in daily report), Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :8579
03/14/2025 4 18 109.6 ASECP004 115.0 12.0 95.3 95 D6938 Pass
Location : perimeter of pond 2 (location shown in daily report), Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, March 14, 2025
Reviewer Name / DateKenneth Mosman, April 29, 2025