- Home
- Density Test Report Report ID: 80069
- Edit Download Report
Density Test Report
Date :03/29/2025
Project No :2025C146
Client Company :Davidson Homes, LLC
Arrival Time :03/29/2025 9:30
Onsite Hours :07:00
Name of the Project :Greene Farms Subdivision
Project Location :1451 Highway 113, Cartersville, Georgia
Weather :sunny
Departure Time :03/29/2025 16:30
ASEC Technician Name :Aminullah Azimi
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 03/29/2025 | 1 | 17.1 | 127.0 | ASECP003 | 109.2 | 18.5 | 99.4 | 95 | D6938 | Pass |
| Location : | road (location as shown in daily report), Elv/Depth :0.5 foot below finished grade | |||||||||
| Comment : | Gauge Serial No. :85759 | |||||||||
| 03/29/2025 | 2 | 16.9 | 109.0 | ASECP003 | 109.2 | 18.5 | 99.8 | 95 | D6938 | Pass |
| Location : | road (location is shown in daily report), Elv/Depth :0.5 foot below finished grade | |||||||||
| Comment : | Gauge Serial No. :85759 | |||||||||
| 03/29/2025 | 3 | 17.1 | 126.1 | ASECP003 | 109.2 | 18.5 | 98.6 | 95 | D6938 | Pass |
| Location : | road (location is shown in daily report), Elv/Depth :0.5 foot below finished grade | |||||||||
| Comment : | Gauge Serial No. :85759 | |||||||||
Technician Signature / DateAminullah Azimi, March 29, 2025
Reviewer Name / DateKenneth Mosman, May 01, 2025
