Skip to content

Density Test Report

Date :04/09/2025
Project No :2025C146
Client Company :Davidson Homes, LLC
Arrival Time :04/09/2025 9:00
Onsite Hours :9:00
Name of the Project :Greene Farms Subdivision
Project Location :1451 Highway 113, Cartersville, Georgia
Weather :cloudy
Departure Time :04/09/2025 18:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
04/09/2025 1 18.8 125.0 ASECP003 109.2 18.5 96.3 95 D6938 Pass
Location : Lot #20, Elv/Depth :9 feet below finished grade
Comment : Gauge Serial No. :85759
04/09/2025 2 18.8 105.1 ASECP003 109.2 18.5 96.2 95 D6938 Pass
Location : Lot #21, Elv/Depth :9 feet below finished grade
Comment : Gauge Serial No. :85795
04/09/2025 3 17.6 106.5 ASECP003 109.2 18.5 97.5 95 D6938 Pass
Location : Lot #22, Elv/Depth :9.5 feet below finished grade
Comment : Gauge Serial No. :85759
04/09/2025 4 18.2 105.1 ASECP003 109.2 18.5 96.2 95 D6938 Pass
Location : Lot #24, Elv/Depth :11.5 feet below finished grade
Comment : Gauge Serial No. :85759
04/09/2025 5 17.7 106.2 ASECP003 109.2 18.5 97.3 95 D6938 Pass
Location : Lot #26, Elv/Depth :
Comment : Gauge Serial No. :85759
04/09/2025 6 18.2 106.6 ASECP003 109.2 18.5 97.6 95 D6938 Pass
Location : Lot #26, Elv/Depth :
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, April 9, 2025
Reviewer Name / DateKenneth Mosman, May 02, 2025