Density Test Report

Date :04/24/2025
Project No :2024C213
Client Company :WDG
Arrival Time :04/24/2025 10:00
Onsite Hours :
Name of the Project :Covington Town Center PH II
Project Location :Covington, GA
Weather :
Departure Time :04/24/2025
ASEC Technician Name :Solomon Cherie

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
04/24/2025 1 15.3 107.2 ASECP001 106.0 18.2 101.1 95 D6938 Pass
Location : Fire wall around the building, Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :30942
04/24/2025 2 17.9 119.5 ASECP001 106.0 18.2 95.7 95 D6938 Pass
Location : Fire wall around the building, Elv/Depth :1.5 feet below finished grade
Comment : Gauge Serial No. :
Technician Signature / DateSolomon Cherie, April 24, 2025
Reviewer Name / DateKenneth Mosman, May 04, 2025