Skip to content

Daily Field Report

Date :04/28/2025
Project No :2025C160
Client Company :Artisan
Arrival Time :04/28/2025 10:00
Onsite Hours :03:00
Name of the Project :Rockmart Township - 115 Felton Drive
Project Location :Rockmart
Weather :Overcast
Departure Time :04/28/2025 13:00
ASEC Technician Name :Sean Willett

Observations/Finding

As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services.  Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.

Our ASEC representative was on site as requested by the contractor (Wilbanks) for the observation/testing of the placement of soils. The contractor requested the technician to identify how much topsoil was present in the bank along Lots #15 through #20. The bank was estimated to be 30 feet wide x 300 feet long with the top elevation at 765.5 and bottom elevation at 756.5.

The contractor began excavating SSMH1.0B to SSMH1.1. Approximately 10 feet from SSMH1.0B 5 feet was undercut and replaced with large riprap and capped with approximately 1 foo to 1.5 feet of No. 57 stone to elevation.

We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.

 

 

trenching SSMH1.0B to SSMH1.1

SSMH1.0B

Approximately 300ft long bank by lot #15 to #20

Approximately 30ft wide bank by lot #15 to #20

Approximately 300ft long bank by lot #15 to #20

Technician Signature / DateSean Willett, April 28, 2025
Reviewer Name / DateKenneth Mosman, May 04, 2025