Skip to content

Density Test Report

Date :04/15/2025
Project No :2025C150
Client Company :Davidson Homes
Arrival Time :04/15/2025 08:00
Onsite Hours :9:00
Name of the Project :Riverwood Retaining Wall
Project Location :Dallas
Weather :sunny
Departure Time :04/15/2025 17:00
ASEC Technician Name :Vamsi Polisetty

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
04/15/2025 1 16.5 94.9 2025-019 SP 95.8 21.5 99.1 95 D6938 Pass
Location : Lot #225 (next to Lot #226), Elv/Depth :third lift
Comment : Gauge Serial No. :29588
04/15/2025 2 16.3 97.0 2025-019 SP 95.8 21.5 101.3 95 D6938 Pass
Location : Lot #226 (next to Lot #227), Elv/Depth :third lift
Comment : Gauge Serial No. :29588
04/15/2025 3 18.2 92.8 2025-018 SP 99.9 18.5 92.9 95 D6938 Fail
Location : Lot #226 (next to Lot #227), Elv/Depth :third lift
Comment : Contractor informed that recompaction required in this area. Gauge Serial No. :29588
04/15/2025 4 17.2 95.1 2025-019 SP 95.8 21.5 99.3 95 D6938 Pass
Location : Lot #227 (next to Lot #228), Elv/Depth :second lift
Comment : Gauge Serial No. :29588
04/15/2025 5 15.5 97.8 2025-019 SP 95.8 21.5 102.1 95 D6938 Pass
Location : Lot #228 (next to Lot #229), Elv/Depth :second lift
Comment : Gauge Serial No. :29588
04/15/2025 6 15.5 96.3 2025-019 SP 95.8 21.5 100.5 95 D6938 Pass
Location : Lot #229, Elv/Depth :second lift
Comment : Gauge Serial No. :29588
Technician Signature / DateVamsi Polisetty, April 15, 2025