Density Test Report

Date :04/21/2025
Project No :2025C150
Client Company :Davidson Homes
Arrival Time :04/21/2025 07:30
Onsite Hours :10:00
Name of the Project :Riverwood Retaining Wall
Project Location :Dallas
Weather :partly cloudy
Departure Time :04/21/2025 17:30
ASEC Technician Name :Vamsi Polisetty

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
04/21/2025 1 15.3 98.4 2025-015 SP 102.8 18.1 95.7 95 D6938 Pass
Location : Lot #225, Elv/Depth :6th lift
Comment : Gauge Serial No. :29588
04/21/2025 2 29.3 84.6 2025-009 SP 89.2 25.2 94.8 95 D6938 Fail
Location : Lot #226 (next to Lot #227), Elv/Depth :6th lift
Comment : In-situ moisture contents higher than optimum. Recommended aeration and recompaction. Gauge Serial No. :29588
04/21/2025 3 16.3 97.0 2025-018 SP 99.9 18.5 97.1 95 D6938 Pass
Location : Lot #227 (next to Lot #228), Elv/Depth :6th lift
Comment : Gauge Serial No. :29588
04/21/2025 4 16.2 96.7 2025-018 SP 99.9 18.5 96.8 95 D6938 Pass
Location : Lot #228 (next to Lot #229), Elv/Depth :6th lift
Comment : Gauge Serial No. :29588
04/21/2025 5 28.1 92.3 2025-019 SP 95.8 21.5 96.3 95 D6938 Pass
Location : Lot #229, Elv/Depth :6th lift
Comment : Gauge Serial No. :29588
Technician Signature / DateVamsi Polisetty, April 21, 2025
Reviewer Name / DateKenneth Mosman, May 03, 2025