- Home
- Density Test Report Report ID: 80744
- This project is inactive from admin. Download Report
Density Test Report
Date :04/24/2025
Project No :2025C150
Client Company :Davidson Homes
Arrival Time :04/24/2025 07:30
Onsite Hours :9:00
Name of the Project :Riverwood Retaining Wall
Project Location :Dallas
Weather :partly cloudy
Departure Time :04/24/2025 16:30
ASEC Technician Name :Vamsi Polisetty
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 04/24/2025 | 1 | 18.9 | 95.4 | 2025-019 SP | 95.8 | 21.5 | 99.6 | 95 | D6938 | Pass |
| Location : | Lot #225 (next to Lot #226), Elv/Depth :Fifth lift | |||||||||
| Comment : | Gauge Serial No. :29588 | |||||||||
| 04/24/2025 | 2 | 17.1 | 89.4 | 2025-019 SP | 95.8 | 21.5 | 93.3 | 95 | D6938 | Fail |
| Location : | Lot #225 (4 feet from face of wall), Elv/Depth :Fifth lift | |||||||||
| Comment : | Recommended to contractor to scarify and recompact prior to retesting. | Gauge Serial No. :29588 | ||||||||
| 04/24/2025 | 3 | 13.2 | 99.6 | 2025-018 SP | 99.9 | 18.5 | 99.7 | 95 | D6938 | Pass |
| Location : | Lot #226, Elv/Depth :Fifth lift | |||||||||
| Comment : | Gauge Serial No. :29588 | |||||||||
| 04/24/2025 | 4 | 16.4 | 93.9 | 2025-019 SP | 95.8 | 21.5 | 98.0 | 95 | D6938 | Pass |
| Location : | Lot #226 (3 feet from face of wall), Elv/Depth :Fifth lift | |||||||||
| Comment : | Gauge Serial No. :29588 | |||||||||
| 04/24/2025 | 5 | 16.5 | 93.8 | 2025-019 SP | 95.8 | 21.5 | 97.9 | 95 | D6938 | Pass |
| Location : | Lot #226 (next to Lot #227), Elv/Depth :Fifth lift | |||||||||
| Comment : | Gauge Serial No. :29588 | |||||||||
| 04/24/2025 | 6 | 16.6 | 99.7 | 2025-018 SP | 99.9 | 18.5 | 99.8 | 95 | D6938 | Pass |
| Location : | Lot #226 (5 feet from face of wall), Elv/Depth :Fifth lift | |||||||||
| Comment : | Gauge Serial No. :29588 | |||||||||
| 04/24/2025 | 7 | 16.9 | 91.3 | 2025-019 SP | 95.8 | 21.5 | 95.3 | 95 | D6938 | Pass |
| Location : | Lot #228 (next to Lot #229), Elv/Depth :Fifth lift | |||||||||
| Comment : | Gauge Serial No. :29588 | |||||||||
| 04/24/2025 | 8 | 18.1 | 99.4 | 2025-018 SP | 99.9 | 18.5 | 99.5 | 95 | D6938 | Pass |
| Location : | Lot #228 (6 feet from face of wall), Elv/Depth :Fifth lift | |||||||||
| Comment : | Gauge Serial No. :29588 | |||||||||
| 04/24/2025 | 9 | 16.3 | 91.1 | 2025-019 SP | 95.8 | 21.5 | 95.1 | 95 | D6938 | Pass |
| Location : | Lot #229, Elv/Depth :Fifth lift | |||||||||
| Comment : | Gauge Serial No. :29588 | |||||||||
| 04/24/2025 | 10 | 16.4 | 94.8 | 2025-019 SP | 95.8 | 21.5 | 99.0 | 95 | D6938 | Pass |
| Location : | Lot #229 (3 feet from face of wall), Elv/Depth :Fifth lift | |||||||||
| Comment : | Gauge Serial No. :29588 | |||||||||
Technician Signature / DateVamsi Polisetty, April 24, 2025
Reviewer Name / DateKenneth Mosman, May 03, 2025
