Skip to content

Density Test Report

Date :04/30/2025
Project No :2025C150
Client Company :Davidson Homes
Arrival Time :04/30/2025 08:00
Onsite Hours :9:00
Name of the Project :Riverwood Retaining Wall
Project Location :Dallas
Weather :partly sunny
Departure Time :04/30/2025 17:00
ASEC Technician Name :Vamsi Polisetty

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
04/30/2025 1 19.3 94.8 2025-019 SP 95.8 21.5 99.0 95 D6938 Pass
Location : Lot #225 (next to Lot #226), Elv/Depth :Sixth lift
Comment : Gauge Serial No. :29588
04/30/2025 02 20.5 94.4 2025-019 SP 95.8 21.5 98.5 95 D6938 Pass
Location : Lot #226 (next to Lot #227), Elv/Depth :Sixth lift
Comment : Gauge Serial No. :29588
04/30/2025 3 17.6 100.1 2025-015 SP 102.8 18.1 97.4 95 D6938 Pass
Location : Lot #227 (next to Lot #228), Elv/Depth :Sixth lift
Comment : Gauge Serial No. :29588
04/30/2025 4 16.2 99.3 2025-015 SP 102.8 18.1 96.6 95 D6938 Pass
Location : Lot #228 (next to Lot #229), Elv/Depth :Sixth lift
Comment : Gauge Serial No. :29588
04/30/2025 5 18.7 101.9 2025-015 SP 102.8 18.1 99.1 95 D6938 Pass
Location : Lot #229, Elv/Depth :Sixth lift
Comment : Gauge Serial No. :29588
Technician Signature / DateVamsi Polisetty, April 30, 2025
Reviewer Name / DateKenneth Mosman, May 04, 2025