Density Test Report
Date :04/18/2025
Project No :2024C213
Client Company :WDG
Arrival Time :04/18/2025 8:00
Onsite Hours :07:30
Name of the Project :Covington Town Center PH II
Project Location :Covington, GA
Weather :sunny
Departure Time :04/18/2025 15:30
ASEC Technician Name :Aminullah Azimi
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 04/18/2025 | 1 | 17.8 | 104.0 | ASECP001 | 106.0 | 18.2 | 98.1 | 95 | D6938 | Pass |
| Location : | water storm trench, 31 feet east from MHB1, Elv/Depth :1 foot below finished grade | |||||||||
| Comment : | Gauge Serial No. :85759 | |||||||||
| 04/18/2025 | 2 | 17.3 | 96.6 | 2025-017 SP | 99.0 | 18.3 | 97.6 | 95 | D6938 | Pass |
| Location : | water storm trench between MHB1 and MHB2, Elv/Depth :1 foot below finished grade | |||||||||
| Comment : | Gauge Serial No. :85759 | |||||||||
| 04/18/2025 | 3 | 16.9 | 104.4 | ASECP001 | 106.0 | 18.2 | 98.5 | 98 | D6938 | Pass |
| Location : | water storm trench, 42 feet SE from MHB1., Elv/Depth :0.5 foot below finished grade | |||||||||
| Comment : | Gauge Serial No. :85759 | |||||||||
| 04/18/2025 | 4 | 17.9 | 115.2 | 2025-017 SP | 99.0 | 18.3 | 98.7 | 95 | D6938 | Pass |
| Location : | service line in the front of building , Elv/Depth :2 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :85759 | |||||||||
| 04/18/2025 | 5 | 17.6 | 104.8 | ASECP001 | 106.0 | 18.2 | 98.9 | 98 | D6938 | Pass |
| Location : | building pad , Elv/Depth :at finished grade | |||||||||
| Comment : | Gauge Serial No. :85759 | |||||||||
| 04/18/2025 | 6 | 18 | 115.2 | 2025-017 SP | 99.0 | 18.3 | 98.6 | 98 | D6938 | Pass |
| Location : | building pad, Elv/Depth :at finished grade | |||||||||
| Comment : | Gauge Serial No. :85759 | |||||||||
Technician Signature / DateAminullah Azimi, April 18, 2025
Reviewer Name / DateKenneth Mosman, May 07, 2025