Density Test Report

Date :04/21/2025
Project No :2025C149
Client Company :Davidson Homes
Arrival Time :04/21/2025 8:00
Onsite Hours :9:30
Name of the Project :Grove at E. Thompson Mill Rd
Project Location :Buford
Weather :sunny
Departure Time :04/21/2025 17:30
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
04/21/2025 1 24.5 98.6 2025-022 SP 103.7 16.1 95.1 95 D6938 Pass
Location : perimeter of pond-1, Elv/Depth :13.5 feet below finished grade
Comment : Gauge Serial No. :85759
04/21/2025 2 25.1 123.9 2025-022 SP 103.7 16.1 95.5 95 D6938 Pass
Location : perimeter of pond-1, Elv/Depth :12.5 feet below finished grade
Comment : Gauge Serial No. :85759
04/21/2025 3 22 100.2 2025-023 SP 103.5 18.9 96.8 95 D6938 Pass
Location : perimeter of pond-1, Elv/Depth :12 feet below finished grade
Comment : Gauge Serial No. :85759
04/21/2025 4 22.5 100.5 2025-023 SP 103.5 18.9 97.1 95 D6938 Pass
Location : perimeter of pond-1, Elv/Depth :12 feet below finished grade
Comment : Gauge Serial No. :85759
04/21/2025 5 18.2 101.6 2025-023 SP 103.5 18.9 98.2 95 D6938 Pass
Location : perimeter of pond-1, Elv/Depth :12 feet below finished grade
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, April 21, 2025
Reviewer Name / DateKenneth Mosman, May 07, 2025