- Home
- Density Test Report Report ID: 81569
- This project is inactive from admin. Download Report
Density Test Report
Date :05/08/2025
Project No :2024C213
Client Company :WDG
Arrival Time :05/08/2025 9:00
Onsite Hours :9:00
Name of the Project :Covington Town Center PH II
Project Location :Covington, GA
Weather :sunny
Departure Time :05/08/2025 18:00
ASEC Technician Name :Aminullah Azimi
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 05/08/2025 | 1 | 23 | 97.0 | 28586 | 98.7 | 20.6 | 98.3 | 95 | D6938 | Pass |
| Location : | Retaining wall A at station 1+50 , Elv/Depth :2 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :85759 | |||||||||
| 05/08/2025 | 2 | 22.2 | 97.1 | 28586 | 98.7 | 20.6 | 98.4 | 95 | D6938 | Pass |
| Location : | Retaining wall A at station 0+25, Elv/Depth :4 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :85759 | |||||||||
Technician Signature / DateAminullah Azimi, May 8, 2025
Reviewer Name / DateKenneth Mosman, May 15, 2025
