Density Test Report
Date :04/22/2025
Project No :2025C149
Client Company :Davidson Homes
Arrival Time :04/22/2025 8:30
Onsite Hours :07:00
Name of the Project :Grove at E. Thompson Mill Rd
Project Location :Buford
Weather :sunny
Departure Time :04/22/2025 15:30
ASEC Technician Name :Aminullah Azimi
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 04/22/2025 | 1 | 25.2 | 94.3 | 2025-022 SP | 103.7 | 16.1 | 90.9 | 90 | D6938 | Pass |
| Location : | pond 1-perimeter , Elv/Depth :11.5 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :85759 | |||||||||
| 04/22/2025 | 2 | 25.5 | 95.7 | 2025-023 SP | 103.5 | 18.9 | 92.5 | 90 | D6938 | Pass |
| Location : | pond -1 perimeter, Elv/Depth :11.5 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :85759 | |||||||||
| 04/22/2025 | 3 | 25.3 | 94.4 | 2025-023 SP | 103.5 | 18.9 | 91.2 | 90 | D6938 | Pass |
| Location : | pond-1 perimeter , Elv/Depth :11 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :85759 | |||||||||
| 04/22/2025 | 4 | 22.1 | 96.6 | 2025-023 SP | 103.5 | 18.9 | 93.3 | 90 | D6938 | Pass |
| Location : | pond-1 perimeter , Elv/Depth :11 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :85759 | |||||||||
Technician Signature / DateAminullah Azimi, April 22, 2025
Reviewer Name / DateKenneth Mosman, May 20, 2025