- Home
- Density Test Report Report ID: 81674
- Edit Download Report
Density Test Report
Date :04/23/2025
Project No :2025C149
Client Company :Davidson Homes
Arrival Time :04/23/2025 9:30
Onsite Hours :08:00
Name of the Project :Grove at E. Thompson Mill Rd
Project Location :Buford
Weather :cloudy
Departure Time :04/23/2025 17:30
ASEC Technician Name :Aminullah Azimi
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 04/23/2025 | 1 | 19.3 | 98.9 | 2025-023 SP | 103.5 | 18.9 | 95.6 | 90 | D6938 | Pass |
| Location : | pond-1 perimeter , Elv/Depth :10 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :85759 | |||||||||
| 04/23/2025 | 2 | 23.5 | 95.9 | 2025-023 SP | 103.5 | 18.9 | 92.7 | 90 | D6938 | Pass |
| Location : | pond-1 perimeter, Elv/Depth :9 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :85759 | |||||||||
| 04/23/2025 | 3 | 19.1 | 98.2 | 2025-023 SP | 103.5 | 18.9 | 94.9 | 90 | D6938 | Pass |
| Location : | pond-1 permiter, Elv/Depth :9 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :85759 | |||||||||
| 04/23/2025 | 4 | 17.8 | 99.2 | 2025-023 SP | 103.5 | 18.9 | 95.8 | 90 | D6938 | Pass |
| Location : | pond-1 perimeter, Elv/Depth :8.5 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :85759 | |||||||||
| 04/23/2025 | 5 | 22.1 | 95.9 | 2025-023 SP | 103.5 | 18.9 | 92.7 | 90 | D6938 | Pass |
| Location : | pond-1 perimeter , Elv/Depth :8.5 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :85759 | |||||||||
Technician Signature / DateAminullah Azimi, April 23, 2025
Reviewer Name / DateKenneth Mosman, May 20, 2025
