Density Test Report

Date :06/04/2025
Project No :2025C146
Client Company :Davidson Homes, LLC
Arrival Time :06/04/2025 08:30
Onsite Hours :
Name of the Project :Greene Farms Subdivision
Project Location :1451 Highway 113, Cartersville, Georgia
Weather :
Departure Time :06/04/2025
ASEC Technician Name :Solomon Cherie

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
06/04/2025 1 16.9 124.9 ASECP005 106.8 16.5 100.0 95 D6938 Pass
Location : Lot #26, Elv/Depth :1.5 feet below finished grade
Comment : Gauge Serial No. :30942
06/04/2025 2 22 95.9 ASECP002 99.4 22.4 96.5 95 D6938 Pass
Location : Lot #28, Elv/Depth :3 feet below finished grade
Comment : Gauge Serial No. :30942
06/04/2025 3 20.9 97.9 ASECP005 106.8 16.5 91.7 95 D6938 Fail
Location : Lot #29, Elv/Depth :1.5 feet below finished grade
Comment : Compaction test failed, it is informed to the grading For man to fix. Gauge Serial No. :30942
06/04/2025 4 17.6 102.4 ASECP005 106.8 16.5 95.9 95 D6938 Pass
Location : Lot #30, Elv/Depth :1.5 feet below finished grade
Comment : Gauge Serial No. :30942
Technician Signature / DateSolomon Cherie, June 4, 2025
Reviewer Name / DateKenneth Mosman, June 09, 2025