Skip to content

Density Test Report

Date :06/07/2025
Project No :2025C160
Client Company :Artisan
Arrival Time :06/07/2025 08:30
Onsite Hours :
Name of the Project :Rockmart Township - 115 Felton Drive
Project Location :Rockmart
Weather :
Departure Time :
ASEC Technician Name :Solomon Cherie

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
06/07/2025 1 20.7 99.3 2025-012 SP 105.6 18.9 94.0 98 D6938 Fail
Location : Lot #15, Elv/Depth :At finished grade
Comment : This area requires recompaction and retesting. Gauge Serial No. :30942
06/07/2025 2 19.6 97.1 2025-012 SP 105.6 18.9 92.0 98 D6938 Fail
Location : Lot #16, Elv/Depth :At finished grade
Comment : This area requires recompaction and retesting. Gauge Serial No. :30942
06/07/2025 3 19.3 101.3 2025-012 SP 105.6 18.9 95.9 98 D6938 Fail
Location : Lot #17, Elv/Depth :At finished grade
Comment : This area requires recompaction and retesting. Gauge Serial No. :30942
06/07/2025 4 20.1 102.2 2025-012 SP 105.6 18.9 96.8 98 D6938 Fail
Location : Lot #18, Elv/Depth :At finished grade
Comment : This area requires recompaction and retesting. Gauge Serial No. :30942
06/07/2025 5 20.3 105.4 2025-011 SP 115.0 15.5 91.7 95 D6938 Fail
Location : Lot #129, Elv/Depth :3 feet below finished grade
Comment : High moisture contents. This area requires scarifying/aeration prior to recompaction and retesting. Gauge Serial No. :30942
06/07/2025 6 22.4 98.4 2025-012 SP 105.6 18.9 93.2 95 D6938 Fail
Location : Lot #130, Elv/Depth :3 feet below finished grade
Comment : High moisture contents. This area requires scarifying/aeration prior to recompaction and retesting. Gauge Serial No. :30942
Technician Signature / DateSolomon Cherie, June 7, 2025
Reviewer Name / DateKenneth Mosman, June 09, 2025