- Home
- Density Test Report Report ID: 82080
- This project is inactive from admin. Download Report
Density Test Report
Date :04/15/2025
Project No :2025C160
Client Company :Artisan
Arrival Time :04/15/2025 08:30
Onsite Hours :07:30
Name of the Project :Rockmart Township - 115 Felton Drive
Project Location :Rockmart
Weather :Sunny
Departure Time :04/15/2025 16:00
ASEC Technician Name :Sean Willett
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 04/15/2025 | 1 | 10.4 | 109.4 | 2025-011 SP | 115.0 | 15.5 | 95.1 | 95 | D2937 | Pass |
| Location : | OCS retention pond Lot #80, Elv/Depth :2 feet below finished grade | |||||||||
| Comment : | ||||||||||
Technician Signature / DateSean Willett, April 15, 2025
Reviewer Name / DateKenneth Mosman, June 23, 2025
