Date :04/18/2025
Project No :2025C160
Client Company :Artisan
Arrival Time :04/18/2025 08:30
Onsite Hours :06:00
Name of the Project :Rockmart Township - 115 Felton Drive
Project Location :Rockmart
Weather :Sunny
Departure Time :04/18/2025 14:30
ASEC Technician Name :Sean Willett

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
04/18/2025 1 16.7 109.5 2025-011 SP 115.0 15.5 95.2 95 D2937 Pass
Location : SSMH 1.0 B , Elv/Depth :4 feet over pipeline
Comment :
04/18/2025 2 13.4 108.0 2025-011 SP 115.0 15.5 93.9 95 D2937 Fail
Location : SSMH1.0A , Elv/Depth :4 feet over pipeline
Comment : Contractor told of results. Recommended recompaction and retesting.
04/18/2025 3 17.3 103.8 2025-012 SP 105.6 18.9 98.3 95 D2937 Pass
Location : SSMH1.0A, Elv/Depth :4 feet over pipeline
Comment :
04/18/2025 4 15.9 109.7 2025-011 SP 115.0 15.5 95.4 95 D2937 Pass
Location : SSMH1.0B, Elv/Depth :4 feet over pipeline
Comment :
04/18/2025 5 12.7 110.2 2025-008 SP 115.7 14.7 95.2 95 D2937 Pass
Location : SSMH1.0B, Elv/Depth :4 feet over pipeline
Comment :