- Home
- Density Test Report Report ID: 82347
- Edit Download Report
Density Test Report
Date :06/19/2025
Project No :2025C160
Client Company :Artisan
Arrival Time :06/19/2025 09:00
Onsite Hours :
Name of the Project :Rockmart Township - 115 Felton Drive
Project Location :Rockmart
Weather :Overcast
Departure Time :06/19/2025
ASEC Technician Name :Sean Willett
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 06/19/2025 | 1 | 27.0 | 0.0 | NaN | 95 | D2937 | Pass | |||
| Location : | BG5 pipeline, Elv/Depth :1 foot over pipeline | |||||||||
| Comment : | Moisture check on backfill materials | |||||||||
Technician Signature / DateSean Willett, June 19, 2025
Reviewer Name / DateKenneth Mosman, August 06, 2025
