- Density Test Report Report ID: 82625
- This project is inactive from admin. Download Report
Density Test Report
Date :06/27/2025
Project No :2025C160
Client Company :Artisan
Arrival Time :06/27/2025 08:30
Onsite Hours :
Name of the Project :Rockmart Township - 115 Felton Drive
Project Location :Rockmart
Weather :Sunny
Departure Time :06/27/2025
ASEC Technician Name :Sean Willett
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 06/27/2025 | 1 | 14.5 | 91.5 | 0 | Check | |||||
| Location : | Roadway, Elv/Depth :2 feet below finished grade | |||||||||
| Comment : | In-situ moisture content test | |||||||||
| 06/27/2025 | 2 | 26.4 | 93.6 | Check | ||||||
| Location : | Roadway, Elv/Depth :2 feet below finished grade | |||||||||
| Comment : | In-situ moisture content test | |||||||||
| 06/27/2025 | 6 | 20.7 | 97.9 | 0 | Check | |||||
| Location : | Roadway, Elv/Depth :2 feet below finished grade | |||||||||
| Comment : | In-situ moisture content test | |||||||||
Technician Signature / DateSean Willett, June 27, 2025
Reviewer Name / DateKenneth Mosman, August 06, 2025