- Home
- Density Test Report Report ID: 82825
- Edit Download Report
Density Test Report
Date :07/07/2025
Project No :2025C160
Client Company :Artisan
Arrival Time :07/07/2025 08:00
Onsite Hours :
Name of the Project :Rockmart Township - 115 Felton Drive
Project Location :Rockmart
Weather :Sunny
Departure Time :07/07/2025
ASEC Technician Name :Sean Willett
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 07/07/2025 | 1 | 14.2 | 99.7 | 2025-012 SP | 105.6 | 18.9 | Check | |||
| Location : | Roadway left of entrance near SSMH 2.0 , Elv/Depth :at finished grade | |||||||||
| Comment : | Conduct field proctor check for roadway testing | |||||||||
Technician Signature / DateSean Willett, July 7, 2025
Reviewer Name / DateKenneth Mosman, August 07, 2025
