Skip to content

Density Test Report

Date :07/15/2025
Project No :2024C217
Client Company :Artisan
Arrival Time :07/15/2025 09:00
Onsite Hours :03:00
Name of the Project :Naturewalk - 7 Hills Amenities
Project Location :Dallas
Weather :sunny
Departure Time :07/15/2025 12:00
ASEC Technician Name :Clyde Smith

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
07/15/2025 1 2.5 130.9 2025-029MP 129.6 8.5 101.0 98 D6938 Pass
Location : East side deceleration lane subbase, Elv/Depth :at finished subbase
Comment : Gauge Serial No. :38069
07/15/2025 2 2.2 129.9 2025-029MP 129.6 8.5 100.2 98 D6938 Pass
Location : East side deceleration lane, Elv/Depth :at finished subbase
Comment : Gauge Serial No. :38069
07/15/2025 3 2.8 130.4 2025-029MP 129.6 8.5 100.6 98 D6938 Pass
Location : East side deceleration lane, Elv/Depth :at finished subbase
Comment : Gauge Serial No. :38069
07/15/2025 4 2.2 128.5 2025-029MP 129.6 8.5 99.2 98 D6938 Pass
Location : East side deceleration lane, Elv/Depth :at finished subbase
Comment : Gauge Serial No. :38069
Technician Signature / DateClyde Smith, July 15, 2025
Reviewer Name / DateKenneth Mosman, July 17, 2025