Skip to content

Daily Field Report

Date :07/18/2025
Project No :2024C217
Client Company :Artisan
Arrival Time :07/18/2025 08:00
Onsite Hours :03:00
Name of the Project :Naturewalk - 7 Hills Amenities
Project Location :Dallas
Weather :Mostly sunny
Departure Time :07/18/2025 11:00
ASEC Technician Name :Safiullah Momand

Observations/Finding

As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services.  Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.

Ongoing activities included:

  1. GAB placement on Shaelly Road (right side).
  2.  Proof-rolling work over the patches and subgrade soils on Shaelly Road (left side).

Observation and recommendations:

The proof-rolling was observed jointly with Paulding County representative, GAB contractor and ASEC personnel. Proof-roll results show no visible pumping and/or rutting.

We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.

4 inches pitches repair of Subgrade

4 inches pitches repair of Subgrade

4 inches pitches repair of Subgrade

Proof rolling

Proof rolling

GAB work in progress

West Deceleration Lane GAB work

West Deceleration Lane GAB work

Technician Signature / DateSafiullah Momand, July 18, 2025
Reviewer Name / DateKenneth Mosman, August 08, 2025