Daily Field Report
Observations/Finding
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.
Ongoing activities included:
- GAB placement on Shaelly Road (right side).
- Proof-rolling work over the patches and subgrade soils on Shaelly Road (left side).
Observation and recommendations:
The proof-rolling was observed jointly with Paulding County representative, GAB contractor and ASEC personnel. Proof-roll results show no visible pumping and/or rutting.
We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.



4 inches pitches repair of Subgrade

4 inches pitches repair of Subgrade

4 inches pitches repair of Subgrade

Proof rolling

Proof rolling

GAB work in progress

West Deceleration Lane GAB work