Concrete Test Report

Date :07/24/2025
Project No :2024C217
Client Company :Artisan
Arrival Time :07/24/2025 07:45
Onsite Hours :
Name of the Project :Naturewalk - 7 Hills Amenities
Project Location :Dallas
Weather :
Departure Time :07/24/2025
ASEC Technician Name :Solomon Cherie

Concrete Placement Information

Location(S): N/A
Testing: 1 Set of concrete specimens (5 per set) were cast during the cast-in-place concrete pour at the above referenced location, in accordance with ASTM C31. The specimen will remain on site for the initial 24-48 hrs curing.
Compliance:

Field placement of concrete appeared to be in accordance with the project specifications (i.e., slump, temperature, etc) (refer to remarks below)

Deviations and/or noncompliances were noted during the field placement (refer to remarks below)

Specimen
Pick Up:
1 Sets of concrete specimens/ 5 specimen per set were picked up & transported to AS Engineering and Consulting LLC (ASEC) for curing and testing in accordance with ASTM C39, C670/1231
Field Curing: Specimen were stored for the initial 24 hours.
Near the poured structure
In an insulated curing box
Other
Remarks: Concrete pour for the curve side was placed. The following measurements were performed: 1) Conc Temp = 85°F 2) Slump = 4.25" 3) Air = 2.5% 4) Unit weight = 169.5 pcf
Technician Signature / DateSolomon Cherie, July 24, 2025
Reviewer Name / DateKenneth Mosman, August 10, 2025