Daily Field Report
Observations/Finding
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.
Concrete pouring for the curbing was done today. The supplier was Ernst Concrete. Two trucks with a total of 18 cubic yards of concrete was placed.
Tests performed from the first truck included temperature, slump, air and unit weight. One set of five cylinders were cast. The cylinders were labeled to be broken on 7, 14, 2 x 28 days and 1 hold. They were placed on the left side of the gate near the hill covered with grass.
We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.

Picture depicting five cylinders

Cylinders covers with card board