Density Test Report

Date :07/24/2025
Project No :2025C160
Client Company :Artisan
Arrival Time :07/24/2025 08:30
Onsite Hours :
Name of the Project :Rockmart Township - 115 Felton Drive
Project Location :Rockmart
Weather :Sunny
Departure Time :07/24/2025
ASEC Technician Name :Sean Willett

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
07/24/2025 1 15.9 102.5 2025-012 SP 105.6 18.9 97.1 95 D2937 Pass
Location : Lot #203, Elv/Depth :801
Comment :
07/24/2025 2 19.7 95.6 2025-012 SP 105.6 18.9 90.5 95 D2937 Fail
Location : Lot #205, Elv/Depth :801
Comment : Recompaction required
Technician Signature / DateSean Willett, July 24, 2025
Reviewer Name / DateKenneth Mosman, August 10, 2025