Daily Field Report
Observations/Finding
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.
Our ASEC representative arrived on-site to observe remediation efforts for the pavement subgrade soils around the building. Four (4) sections were identified that needed remediation. These sections were painted green, had unstable soils removed and replaced by GAB. A temperature reading on the pervious concrete being poured was found to be 89 degrees Fahrenheit during placement.
We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.